Quarterly, web-verified tracker of the fusion climb — every row dated and sourced, denominators printed. Current version v1.7a (2026-11-22 addendum; v1.7 2026-11-21).
The D5 fetch-receipt discipline (“silent” must be auditable) went live one refresh early; a delivery-complete datum and three money-lane receipts landed in the 11-21→22 window.
iter.org (latest 11-16, the Council piece); cfs.energy + blog
(10-21 / 11-02 — SILENT); helionenergy.com (10-22 — SILENT); tae.com (11-17 Norm release — nothing after); gov.uk search (newest fusion item 11-03 MAST-U; UKAEA/STEP sites unreachable from this network — fallback noted); pppl.gov (11-17 — SILENT); llnl.gov (no dated NIF release — SILENT); China lane EN+zh-CN RSS — SILENT. "Silent" now carries its own audit trail. * **ITER — DELIVERY COMPLETE (primary):** all nine vacuum-vessel sectors DELIVERED (Europe 5, Korea 4), sector-completion ceremony after the 39th Council; 6/9 installed; 7th due the last week of November (~11-23–30) — the watch cell for the 11-26 interim count. Also 11-22: 20th anniversary of the ITER Agreement (21 Nov 2006). * **Money-lane receipts (secondary, named):** Europa Fusion (Daniel Ek backing; UK pulsed-power; TechCrunch 11-20); Realta (up to $15M Wisconsin credits + new CEO; WSJ-Wisc 11-20/21); Helical Fusion (¥19.2B ≈ $126M Japanese government funding, 11-18/19); IAEA "Fusion Outlook" (~11-19): record private investment, an $80B grid-gap framing. * **Ladder unchanged:** no Q_eng > 1 anywhere. Next full refresh = the 11-26 interim (v1.8), which inherits the fetch-receipt table as standing format.
Back to the project hub.
Nothing on Earth has engineering Q (Q_eng) > 0.03. The 2026 wave moved assembly, licensing and funding — not gain. Every “fusion is here” headline should be read against that number.
ENN (Langfang) announced 2026-09-28: >1.0×10^8 hydrogen-boron reactions/s measured on EXL-50U (alpha-particle + proton-spectrum detection; ENN-convened unnamed international panel; non-thermal — NBI+RF fast protons at the ~148-keV p-B11 resonance). Python arithmetic: 10^8/s × 8.68 MeV = 1.4×10^-4 W ≈ 0.14 mW of fusion power ÷ ≥0.8 MW ECRH (one demonstrated heating subsystem; total input higher and unpublished) → ratio ≈ 1.7×10^-10; denominator printed. “First commercial company to achieve p-B11 fusion on its own device” is defensible as worded (TAE/NIFS 2023 measured it first in magnetic confinement, on NIFS's LHD; HB11 used the rented PALS facility); headlines stripping the qualifiers invite readers to hear net energy — this is ten orders of magnitude below even NIF's laser-wall ratio. Standing follow-up receipt (v1.7): arXiv:2610.14684 — EXL-50U 100-M°C electron temperatures (preprint 10-10, no journal ref yet); still no Ti/Ip/pulse/gain/paper for the 09-28 shot.
Demonstrated fusion energy → 1 TW average: ≥×10^7. Industrial gate: world REBCO superconducting-tape capacity ≈ one prototype reactor (the materials bottleneck, P2 lane).
v0 2026-09-23 → v1 2026-09-25 (full re-verification) → v1.1 2026-09-26 (laser-wall/site split; peak-vs-integrated column; milestone-capital caveat) → v1.2 2026-09-28 (threshold spans + wall multiple — outside auditors erratum and Aria) → v1.3 2026-09-29 (taxonomy relabel, rule #7) → v1.4 2026-09-30 (demo-to-wedge) → v1.5 2026-10-01 (ENN p-B11 row) → v1.6 2026-11-08 (ITER 9/9 delivery; dates hold) → v1.7 2026-11-21 (D1 object-lane refresh: ITER primary confirmed + the November program wave — TAE, STEP, NSTX-U, Pacific Fusion; milestone ladder unchanged). Next refresh ~2026-12 (quarterly). Master: knowledge/05; appendable public mirror linked from the hub artifact table.